|
|
 |
I.after-sales service To protect zhe legitimate rights and interests of consumers ,zhe company sold products to the ¡°three bags of¡±service, please take good care of zhe majority of users purchase a valid invoice, warranty card and the use of brochures,in a timely manner in order to get three bags of service. 1.three bags of range products based on the user¡¯s manual provides that zhe right to operate,as a result of manufacturing quality is always important,or lead to vehicle parts and components can not be used by companies to identify special maintenance technicians confirmed by the company commissioned by the company or dealers ()for three bags of service. 2.Not ¡°three bags of¡±the scope of content: ¢Ùnot in accordance with the provisions of the use of brochures; ¢Únot in accordance with zhe requirements of zhe maintenance manual; ¢Ûimproper use or an accident or a collision caused by zhe wrongful use of fault; ¢Üirresistibie factors; ¢İwithout special consent to repair the maintenance department. ¢Şusers to make alterations or demolition of parts caused by the decomposition of accessories or damage to the vehicle. No purchase invoice ,warranty card-vehicles are not inconcictent with the ¡°three bags,¡±wearing parts, no consumables ,¡±three bags.¡± II, the battery maintenance ¢Ùthe surface of the battery , cables and bolts should be kept clean and dry a long time.If electrolyte leakage application wiped clean cotton yarn, and then rinse with water and dry.Note:the cleaning process,tap water is structly prohibited to enter inside the battery, so as to avoid leakage and increased self-discharge,resulting in the vehicle running out of order. ¢ÚBattery connections must be good.Check the batteries regularly connect any fastening nut loose,so as not to cause a spark and burn column. ¢ÛOn the battery not to place any item can not be negative battery is connected directly to avoid short-circuit,damage batteries ¢ÜAfter the battery dischrge (regardless of traffic time and mileage),must charge the same day,the next day, not allowed to charge or charge more than 24 hours ,or battery life will be affected. ¢İBatteries used in the process ,as the electrolyte electrolysis of water and evaporation can cause increased density and surface decline (especially in the summer),it should be kept under check,add the electrolyte(in general can only sdd distilled water),Rechargeable batteries in the end, distilled water or with a density of 1.400 of a dedicated lead-acid batteries dilute sulfuric acid electrolyte to adjust the density of 1.275Ê¿0.005(25¡æ)level with the same high level line .Adjusted 0.5-1 hours to charge,so that the internal uniflrm. ¢ŞInside the battery are not allowed to fall into the hands of any impurities.Add liquid used in the apparatus should be kept clean to avlid impurities into the battery inside. ¢ßDrivers in the running ,at any time to observe the insructions of the battery meter(instrument panel on the power grid-beating tabie, to stop running,in time charge),it is estimated that the vehicle¡¯s mileage,so as not to charge the vehicle can not return in time charge,Batteries have been caused by discharge and shorten the useful life. ¢àVehicles if not for a long time,the battery shouid be full of power after the atore,and every half a month to a charge,charge time to 24 hours. ¢áCharge,the vehicle should be grateful if you put good air circulation,and open the battery cover in order to avoid an accident. ¢âGood and sufficient power, the battery cover tightly covered(check whether or not plug the pores piaza,should be clear if). ¢Ïbatteries used in the process, the monthly charge should be a balance III.charger use and maintenance ¢ÙAC power outlet charger with the Ac power plug to match. ¢ÚAC voltage should be more stable ,the change should not exceed 220v Ê¿10% range. ¢ÛCharge operation: a, disconnect the power supply vehicle lock switch b, charging plug and socket body charge connected to c Plug power and the city of power points and connected ¢Üconnected to the power charger ,the wiring in the right time when the power indicator light , 1-30A-charge current bright lights all the way filling Heng, Heng 2 nd charge indicator light ,the charge time status power deficit over the next 10 hours as well. ¢İCharging process of change is as follows; the first of the 25A constant current charging about 6 hours; the second phase of the charging voltage of about 3 hours;Floating into the final stage,at this time, the Floating Lantern Festival light, the charge current only bright light 1-2 Only,the fans stop spinning. Saturated Floating into the lights phases that have sufficient battery power. ¢ŞTo be full of battery power,or any need to shut down, the need to disconnect input power charger and then disconnect the battery and charger connection.
|
|